2nd Floor Bathroom
I installed the tub, built the shower pan, and installed wonderboard on the walls behind the shower and tub.
The tub was the heaviest that I ever had to move. The first 2 flights were tough, but for the last pitch, a winch was needed.
.
.
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
After the tub was installed, I could finish framing build the shower pan and install the wonder board.
.
.
After we moved into the upstairs bed room, it was desirable to have a functioning toilet nearby. The midnight trip to the downstairs bathroom through the construction zone was inconvenient.
We shopped for the tile, and after 4 months it arrived. The tile from Italy took the longest and cost the most. Luckily we did not need a lot of it.
The plan was to tile the side foyer floor and the 2nd floor bathroom floor at the same time while the wet saw was set up on the side of the house.
After the floor was finished, I installed the toilet. Its a little crude, one has to bring in a flashlight if it is dark, but it works.